Fees

Current fees and rates charged by Whatcom County Planning and Development Services (PDS) are adopted under Ordinance 2014-063 (PDF). Please see the Unified Fee Schedule (PDF) for all applicable permit based fees.

Building permit fees are largely based on the valuation of the proposed structure, the project’s proximity to critical areas and the number of proposed mechanical and plumbing fixtures. Additional development permits, not included in this worksheet, may also be required. Such separate permits may include, but are not limited to, shoreline developments, encroachment and/or other applicable current planning and fire permits.

Estimations
The Building Permit Estimate Worksheet (XLS) helps estimate the projected cost of a single family residence or detached structure building permit.

Building Permit Deposits
At the very least, a deposit fee is required at the time you submit your building permit application. This fee will be deducted from your total building permit cost with the remainder balance to be paid at the time you pick up your permit.

The deposit fees are broken down based on the type of permit being applied for and the proposed square footage of the structure.

If we are able to issue your permit during your application submittal appointment, we will collect all fees in full. 
  1. Commercial (COM)
  2. Manufactured Homes (MOB)
  3. Residential Detached
  4. Single Family Residences (SFR)
All commercial structure deposits will be determined at prescreening.