The list below shows our current and planned projects.
View information about the construction of a soft shore berm and pathway along Birch Bay Drive.
Link to pageThe work will involve the pavement rehabilitation of approximately 2 miles or roadway, installation of rumble strips and new pavement markings.
Link to pageDeer Trail landslide road repair
Link to pageImprove flood protection to critical infrastructure south of downtown Ferndale.
Link to pageProposed stormwater treatment project in the Lake Whatcom watershed, Whatcom County.
Link to pageReduce risk of alluvial fan flood damage in the Glacier community.
Link to pageView information about the planned replacement of Jackson Road bridge in Birch Bay
Link to pageMarine Drive - Locust Avenue to Alderwood Avenue
Link to pageMarshall Hill Road is experiencing severe erosion of the material beneath the roadway pavement, called subgrade, and the embankment of the adjacent hillside. The affected area is 1000 feet east of the intersection with Cronk Rd. For safety, this portion of roadway is currently restricted to one-lane with temporary stop signs in either direction.
Link to pageThis intersection currently experiences delays due to the lack of left-turn channelization on Smith Road.
Link to pageIntegrated habitat restoration and flood risk reduction project in in the lower South Fork Nooksack (Nuxw7íyem) River.
Link to pageSwift Creek, originating on Sumas Mountain, has a long history of sediment loading and reduced hydraulic conveyance capacity with consequent flooding as a result of a natural landslide.
Link to pageCompleted projects by Whatcom County Public Works
Link to page