This project will replace a small breakwater with a larger and longer breakwater. This will provide for greater safety for the ferry boat from winds as it comes into the dock on the Lummi Island terminal.
Project Engineer - Bridge & Hydraulics
322 N. Commercial Street, Ste. 301
Bellingham, WA 98225
360-778-6297